I got a few quotes from electricians to install my Chargepoint Home Flex EVSE. The one I scheduled cannot come until mid February, but that should still be WAY before I see my theoretical Mini (whose order is still waiting acceptance). The electricians I spoke with recommended hardwiring the Chargepoint because putting in a NEMA 14-50 outlet would require a GFCI outlet, and, as has been discussed here, even the Chargepoint installation manual recommends hard wiring to avoid false trips of a GFCI. I'm in South Carolina.
My experience level with an EV is zero. So, just to make sure I have the somewhat confusing terms correct:
(1) The level 2 EVSE I purchased comes with a J1772 plug, and this is the type of plug that, when available at a public charging station, will provide a complete charge in around 4 hours. (As well as the Chargepoint in my garage) Correct?
(2) We have family 90 miles away from our house, so I was looking at available public charging stations in that area. I see four types listed:
- J1772
- CCS/SAE Combo: This is the DC fast charge type for the Mini which can normally get you from empty to 80% in 30 minutes?
- CHAdeMO: The Mini does not use this standard, right?
- Tesla: N/A
The contents of the Chargepoint box: (and our cat, Oz)
View attachment 10513