I have a 40 kW 2019 Leaf (in Canada), and I'm planning to add charging capability at my new cottage, assuming I'm lucky enough to get my offer accepted. I currently do not charge my vehicle at home (condo management is uncooperative), so it's my first time considering this question.
Given that the Leaf comes with L1 and L2 charging equipment, do I actually need a 3rd party EVSE at my cottage (eg Juicebox, Clipper Creek, etc)? I am thinking that I can still get L2 charging if I get a NEMA 14-50 outlet installed outside on a 40A circuit, without needing the extra equipment. Am I right, or am I missing something that will get me useful features. Yes, I won't have to pull out the cable from my trunk all the time, but that's about all I can see missing. Perhaps some speed? How do I calculate how much? That's a significant $800+ savings
Given that the Leaf comes with L1 and L2 charging equipment, do I actually need a 3rd party EVSE at my cottage (eg Juicebox, Clipper Creek, etc)? I am thinking that I can still get L2 charging if I get a NEMA 14-50 outlet installed outside on a 40A circuit, without needing the extra equipment. Am I right, or am I missing something that will get me useful features. Yes, I won't have to pull out the cable from my trunk all the time, but that's about all I can see missing. Perhaps some speed? How do I calculate how much? That's a significant $800+ savings