Tim94549
Active Member
I have yet to need to use Charging stations since my purchase of my Kona and am about to take a trip thereby needing to use them. Sorry for my newbie questions, but just don't want any surprises while on my journey. So here goes:
Using the ChargePoint APP :
1. Using the FILTERS, I see a bunch of CONNECTOR types. If I want to find JUST a "fast charger" (so I don't have to sit someplace for hours), should I be filtering on the "DC FAST - COMBO" ? What is "DC FAST - CHAdeMO" ? Are BOTH of those compatible with the Konas?
2. When I look at the "AC - J1772" filters, those all appear to be only 6.6kw charges (only around 20 mi/hr) ... Am I seeing that correctly? So these are NOT "FAST Charging stations & I should probably remove from my filters?
My GOAL is to ONLY know where FAST chargers are to limit my time at a station. It also doesn't look like ALL "FAST CHARGER" stations are a minimum of 50kw ? I see some that are 24/kw = 72 mi/hr. So I am a bit confused what I am able to find using the ChargePoint APP.
Lastly - Do I HAVE to use CHARGEPOINT to charge? I'm seeing a LOT more options using the PLUGSHARE APP .. in fact there's more 50kw charges showing up with connector type "CCS/SAE" - that LOOKS like the Kona connection????? But THESE look like I'm require to have the "EVgo" APP to use them..
Anything else I should consider when using these? Thanks in advance & your experience on how to best do this.
Using the ChargePoint APP :
1. Using the FILTERS, I see a bunch of CONNECTOR types. If I want to find JUST a "fast charger" (so I don't have to sit someplace for hours), should I be filtering on the "DC FAST - COMBO" ? What is "DC FAST - CHAdeMO" ? Are BOTH of those compatible with the Konas?
2. When I look at the "AC - J1772" filters, those all appear to be only 6.6kw charges (only around 20 mi/hr) ... Am I seeing that correctly? So these are NOT "FAST Charging stations & I should probably remove from my filters?
My GOAL is to ONLY know where FAST chargers are to limit my time at a station. It also doesn't look like ALL "FAST CHARGER" stations are a minimum of 50kw ? I see some that are 24/kw = 72 mi/hr. So I am a bit confused what I am able to find using the ChargePoint APP.
Lastly - Do I HAVE to use CHARGEPOINT to charge? I'm seeing a LOT more options using the PLUGSHARE APP .. in fact there's more 50kw charges showing up with connector type "CCS/SAE" - that LOOKS like the Kona connection????? But THESE look like I'm require to have the "EVgo" APP to use them..
Anything else I should consider when using these? Thanks in advance & your experience on how to best do this.