200 people who lease the 530e will receive free of (pardon the pun) charge including installation (California only)
3.2kW @ 85% efficiency will charge the 9.2 kWh pack in 3.5 hours:
https://www.greencarcongress.com/2019/08/20190810-bmw.html
I wonder if this deal will apply to the 530e x drive which will have a larger capacity of 12 kWh:
https://www.greencarcongress.com/2019/08/20190803-bmw.html
3.2kW @ 85% efficiency will charge the 9.2 kWh pack in 3.5 hours:
https://www.greencarcongress.com/2019/08/20190810-bmw.html
I wonder if this deal will apply to the 530e x drive which will have a larger capacity of 12 kWh:
https://www.greencarcongress.com/2019/08/20190803-bmw.html