Washington State

I was excited for a moment thinking they were installing the electrolyzer and hydrogen fuelling station at the same location, thus doing away with transportation issues.

Oh well it'll interesting to see how the financials for this play out. A good test for periodic generation.
 
20 million for a 5 megawatt facility is a lot of money.

For comparison 5 megawatt Tesla Megapack facility with electronics and servicing costs 3 million.
 
Last edited:
Back
Top