I am trying to find some information about the minimum power at which EVs can charge. I am aware of the acceptance rate, onboard chargers, and that at L1 the car usually draws 1.4KWh, at Level 2 it draws between 6.6 and 7.2 KWh or 3.3 KWh if that is what the acceptance rate is.
My question is, can EVs charge if the grid only provides 0.9KWh or 0.5KWh, even though it would be slow?
I have noticed numbers of less than 1KWh on my Honda Clarity's Chargepoint App at the end of charging sessions when the battery is full.
Any pointers and links would be greatly appreciated.
My question is, can EVs charge if the grid only provides 0.9KWh or 0.5KWh, even though it would be slow?
I have noticed numbers of less than 1KWh on my Honda Clarity's Chargepoint App at the end of charging sessions when the battery is full.
Any pointers and links would be greatly appreciated.